WORK
ABOUT
CONTACT
Search
Menu
Menu
Youtube
LinkedIn
ripper – build log overview
You are here:
Home
1
/
ripper – build log overview
Note
This is an overview – click on the images to see all the details
the story behind, base-welding and painting
setting up the base, preparing aluminum extrusions
assembling the machine-bed and manufacturing the gantry
calibrations, assembling the gantry and preparing the z-axis
building the control box
wiring, cooling system and first system run
final impressions
software configuration and setup
Scroll to top